Guardrails shall be installed along the open sides and ends before releasing the scaffold for use by the employees, other than erection or dismantling crews. Separation of frames can occur in high winds (uplift), or when workers climb endframes, overload the platform, Employees doing overhand bricklaying from a supported scaffold must be protected by a guardrail or personal fall arrest system on all sides except the side where the work is being done. Before erecting a scaffold, the first step is to: a.Perform a site evaluation. d.35 feet, The top rail of a guardrail system must be installed how many inches above the platform? Should he use those planks? Any damaged or weakened component of a scaffold must be repaired or replaced immediately. c.No, because the platform is less than three feet from the ground, or point of access. Additional non-compliant actions associated with scaffolds will also warrant retraining and if necessary, disciplinary actions by their department. Direct access is acceptable when the scaffold is not more than 14 inches (36 cm) horizontally and not more than 24 inches (61 cm) vertically from the other surfaces. Outriggers must be used on narrow frame type scaffolds (i.e. a.5 feet b.20 feet Scaffold planks should extend over their end supports not less than 6 inches nor more than 18 inches. 1.Climb the cross braces. the forklift is not moved horizontally while the platform is occupied. a.15 feet \text { Advertised } 2. The periodicity of this training to be determined by EHS and the departments management, but should not exceed a period of 5 years from the previous training. The department recognizes that all employees who intend on occupying a scaffold must go through the appropriate scaffold user training (see above) conducted by a qualified person (i.e. Scaffolds must be plumb, level, and squared. The lifeline must be attached securely to substantial members of the structure (not the scaffold) or to securely rigged lines that will safely suspend the employee in case of a fall. This scaffold is overloaded and planks are strained. The ground where he needs to place the footing is dry but uneven in spots. Access must be provided when the scaffold platforms are more than 2 feet (0.6 m) above or below a point of access. When it is infeasible to provide a work area at least18 inches (46 centimeters) wide, guardrails and/or personal fall arrest systems must still be used. What should be Jayden's next step? Each worker on a suspended scaffold must be protected by a personal fall arresting system attached to an independent lifeline. All scaffolding shall have toe boards, screens, a guardrail system and/or debris nets as determined by a competent person. a TRUE b FALSE 5 A means of access must be provided to a scaffold platform if there is no existing access within____feet of the platform. Training of other scaffold users if needed. A scaffold is a temporary structure erected to support access or working platforms. 8. 1926.451(e . application/pdf d. Four feet. b. All scaffolds used in construction, renovation, repair (including painting and decorating), and demolition shall be erected, dismantled and maintained in accordance with this policy and procedure. Select the correct answer and then click DONE. The competent person is responsible for determining the safety and feasibility of installing and using safe means of access, based on site conditions and the type of scaffold involved. EXCEPTION: Scaffolds and materials may be closer to power lines than specified where such clearance is necessary for performance of work and only after the utility company or electrical system operator has de-energized or relocated the lines. Cross-braces of the proper length must be used to ensure that the scaffold will remain plumb and rigid. No University employee shall design any scaffolding. Cross bracing is acceptable in place of a mid-rail when the crossing point is between 20 30 inches above the work platform or as a top rail when the crossing point is between 38 48 inches above the work platform. b.Use the scaffolding as is. Select the correct answer and then click DONE. Specific requirements are described below. a. d. Repair any defective scaffolding components. Ensure that employees performing overhand bricklaying operations from a supported scaffold are protected from falling from all open sides and ends of the scaffold, except at the side next to the wall Remove ties and braces. Make sure all brace connections are properly secured to prevent dislodging. Scaffold components manufactured by different manufacturers shall not be intermixed unless the components fit together without force and the scaffolds structural integrity is maintained. Select the correct answer and then click DONE. Only authorized scaffold erectors can erect scaffolds on campus. %PDF-1.4
%
In its simplest form, a scaffold is any temporary elevated or suspended work surface used to support workers and/or materials. There are many types of scaffolds, both supported and suspended. This includes (but is not limited to): mudsills, screw jacks, frames, braces, planks, access ladders, brackets, etc. Work shall not be permitted during high winds. Refusing to occupy a scaffold prior to the Competent Person providing documentation indicating that the scaffold has been inspected and deemed safe. Supported scaffold - a type of scaffold that is supported by poles, frames, and outriggers, and usually consists of one or more platforms. This scaffold has no guardrails and is not fully planked. uuid:1f2371a8-90ab-42b0-a1cd-a86bdbf5cef5 \end{array} & \begin{array}{l} front-end loaders and similar pieces of equipment are not used as support scaffold platforms, unless they have been specifically designed by the manufacturer for such use. Refresher type training will be provided on an as needed basis; the periodicity of this training to be determined by EHS and the departments management, but should not exceed a period of 5 years from the previous training. Then this must be inspected when conditions change, such as sunny conditions, warming temperatures, etc. Make sure scaffold components manufactured by different manufacturers are not intermixed, unless they fit together without being forced and the scaffold's structural integrity is maintained. Standard guardrails (e.g., handrail and midrail) and toeboards must be provided for all open sides of the scaffolding that are ten (10) feet or more above the surrounding surfaces. The competent person is responsible for determining the safety and feasibility of installing and using safe means of access, based on site conditions and the type of scaffold involved. Make sure integral (built-in ladder) scaffold access frames: Stair towers have many specific design requirements. Make sure wooden planking is covered with opaque finishes, except that platform edges may be marked for identification. An employee was on a scaffold that was being dismantled when the scaffold collapsed. The end points at each upright shall be no more than 48 inches. How can you ensure that scaffolding will automatically remain plumb, level, and square? Competent people shall only receive training from other competent people. d.Five times, Which would provide a more stable foundation? Ensure each employee on a scaffold more than 10 feet above a lower level is protected from falling to that lower level. What do you need to do with a ladder that is defective? In rare instances such as this, EHS will be called in to provide guidance as to the safety of the scaffold. 11. d.12. They must be in good worker order or tagged as defective and taken out of service. The weather has been an issue and has pushed the project back. When vertical lifelines are used, check to ensure they are fastened to a fixed safe point of anchorage, independent of the scaffold, and are protected from sharp edges and abrasion. d.12 inches, If the platform is over 10 feet, it cannot exceed how many inches over the centerline support? 3.Check that no structural alterations were made. 2.Work at a lower level than they usually do. b.Three times How can the components of this jury-rigged scaffold possess sufficient structural integrity? Access must be provided when the scaffold platforms are more than 2 feet (0.6 m) above or below a point of access. Additionally a user has the right to refuse to occupy the scaffold should they contest the competent persons findings. Base plates or screw jacks shall be in firm contact with both the sills and the legs of the scaffolding. Scaffold Platform Construction What are scaffold platform construction requirements? The platform gaps are too wide. a. \text { Target } \\ For a scaffold to be safe, it must be erected: . Direct access from another surface is acceptable when the scaffold is not more than 14 inches horizontally and not more than 24 inches vertically from the other surfaces. A scaffold can be overloaded by removing the braces, which causes the weight on the scaffold to be distributed to fewer structural members. Make a chart listing each ad and describing it as shown in the example below. A list of competent persons will be maintained by the department and additional refresher type training will be provided on an as needed basis. Frequency of the training to be determined by EHS and department management, but should not exceed period of 5 years from the previous training. Insulated Lines; Voltage Minimum; Distance Alternatives, Uninsulated Lines; Voltage Minimum; Distance Alternatives. Contact EHS for assistance and guidance in any of the duties associated with being a Competent Person. There were no guardrails at the working level. Select the correct answer and then click DONE. Guardrail systems must be capable of withstanding, without failure, a force of at least 200 pounds applied in a downward or outward direction at any point within two inches of the top edge of the top rail. Make sure hook-on and attachable ladder rungs: are positioned so that their bottom rung is not more than 24 inches above the scaffold supporting level; have uniform spacing between rungs of a maximum 16 inches; have minimum rung length of 11 inches; and, have rest platforms provided at a maximum of 35-foot vertical intervals. Note: A level should be used during assembly to make sure new structural components remain in line. This threshold differs from 29 . Select the correct answer and then click DONE. Scaffolding student language requires that teachers understand their students and the language being used during lessons, to identify and support the targeted language that can be provided during instruction. Make sure cross-braces on tubular welded frame scaffolds are not allowed to be climbed. Ensuring all affected employees follow the prescribed practices within this policy; and. Hot asphalt paving (summer) - This type of asphalt (top coat) is soft when placed and then compacted with rollers. Jayden and his crew are anxious to begin erecting scaffolding at the new job site. Providing a scaffold to the user that is free from recognizable and preventable hazards (i.e. The department shall maintain a list of all employees within the department who have been authorized (through both training and experience) as scaffold erectors; and provide notice to the employees who have been deemed to be authorized erectors. \end{array} \\ He fell 16 feet to the ground, sustaining facial fractures and other injuries. What are the main hazards associated with erecting, dismantling, and working on scaffolds? Ensure each employer working at any level over dangerous equipment while on a scaffold is protected from falling into the equipment. Its critical to check to make sure scaffolds do not exceed their rated capacity. Inspecting all scaffold components prior to assembly to insure that components used are of similar material and in good repair before becoming a part of the completed scaffold. Proper pinning is necessary to make sure the scaffold is steady and does not collapse. 1.Use gravel to fill in the uneven spots. The competent person is the shop supervisor or her/his designated representative. \text { discount; pink or silver; } \\ The height of the scaffold in relation to the minimum base width, wind loads, the use of brackets or cantilevered platforms and imposed scaffold load determines the need for stability bracing. Scaffold should not be occupied while moving unless a competent person has determined it is safe to do so. or strike the scaffold with tools, materials, etc. When scaffold platforms are more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel What are integral (built-in) access frames specifically designed for? 4.Ice, What is the minimum safe approach distance for you to maintain from overhead power lines to avoid electrical hazards when working on scaffolding? 3.Maintain three points of contact while on a ladder. Stairways must: have the stringers with a maximum slope of 60 degrees from the horizontal handrail on the open side of each flight Ramps used to access scaffolds must: Have a slope gradient not exceeding 1 in 3. Two tiebacks installed at opposing angles are required when a perpendicular tieback cannot be installed. Make sure frames and panels are joined together vertically by coupling or stacking pins or equivalent means. to prevent falls. All planking or platforms must be overlapped a minimum of twelve (12) inches and secured from movement. To control the risk of a scaffold falling or collapsing, employers must assure that scaffolds are built within OSHA standards relating to strength and structural integrity. b.18 inches d. No, because the height of the platform is easily accessed from the ground, When used, hook-on and attachable ladders must be positioned so that their bottom rung is not more than how many inches above the scaffold support level? Make sure that anything that could cause a slip, trip or fall (i.e. He performed a site evaluation and is ready to erect the scaffolding. (b) Googles? If a ramp or walkway has a slope of more than 1:8, make sure it has cleats securely fastened to the planks not more than 14 inches apart, to provide footing. Wood planks used for platforms on scaffolding shall be specifically graded for scaffold use by an approved grading agency. d.Two mud sills per leg, Scaffolds must be erected, dismantled, moved, or altered only under the supervision of a(n) ________. b.Two feet 10, 15 Note: Except where indicated, the same basic scaffold requirements that appear in this module also apply to manually propelled, pump jack, ladder jack, tube and coupler, and pole scaffolds, as well as the specialty scaffolds described in this course. The scaffold and its components must be capable of supporting four times the rated load. When horizontal lifelines are used, make sure they are being secured to two or more structural members of the scaffold. c.4 to 1 are positioned so that their bottom step is not more than 24 inches above the scaffold supporting level; have rest platforms at maximum vertical intervals of 12 feet; have a minimum step width of 16 inches, except for mobile scaffold stairway-type ladders, which must have a minimum step width of 11 inches; and, have slip-resistant treads on all steps and landings. forklifts are not used to support scaffold platforms, unless: the entire platform is attached to the fork; and. 1926.451 (b) (9) ). c.Re-evaluate the site, as the ground conditions have changed due to weather. 100% (1) Access must be provided when the scaffold platforms are more than 2 feet above or below a point of access. Reviewing this policy to ensure compliance with current regulations; Reporting any questionable conditions that are discovered to the responsible department; Ensuring all affected employees are trained in accordance with this policy. 2.Electrical The scaffolding will extend twenty feet into the air. Note: Platforms may be coated periodically with wood preservatives, fire retardants, and slip-resistant finishes, provided they do not obscure the top or bottom wood surfaces. Ensure scaffold platforms and walkways are at least 18 inches wide, unless they are used in areas that are so narrow that they must be less than 18 inches wide. What is a joint underwriting association (JUA)? The scaffold distance between an insulated 220-volt line must be at least three feet. Scaffolding is widely used during construction and renovation activities. Guardrails shall be constructed as follows: All job sites and work areas shall be inspected prior to the erection of scaffolds to determine the sites ability to support structure, and for location of electric power lines, overhead obstructions, wind conditions, and the need for overhead protection or weather protection coverings. Ropes capable of supporting at least six (6) times the rated load must be used to suspend two-point suspension scaffolds. Select the correct answer and then click DONE. b.Yes, because the platform is more than two feet off the ground, or point of access. Compute the recent two years cash flow on total assets ratio for Samsung. A qualified person must design all scaffolding in accordance with OSHA 29 CFR 1926.451 General Requirements for Scaffolds and 29 CFR 1926.452 Additional Requirements Applicable to Specific Types of Scaffolds. 4.Use cinder blocks to level the uneven ground. 1.Slips and falls c.After it has been used Employers must provide access when the scaffold platforms are more than 2 feet (0.6 m) above or below a point of access. Requirements to prevent falls that apply only to these workers are addressed separately below. a 1 b 2 c 3 d 4 Training of other competent persons, scaffold erectors, and users. All other components must be capable of supporting at least four (4) times the rated load. Tying, guying, or bracing may be needed to assure a safe and stable scaffold assembly. It is impossible for a stable structure to be built upon a foundation that does not start out square and level. Ensure hook-on or attachable ladders are installed as soon as scaffold erection has progressed to the point that permits safe installation and use. c. 3.5 inches Direct access is acceptable when the scaffold is not more than14 inches horizontally and not more than 24 inches vertically from the other surfaces. Ensure planking is free of cracks and splits and within deflection limits (see below), Verify that planking remains within its safe load-bearing capacity. Scaffolds must be erected, dismantled, or moved only by properly trained workers under the supervision of a competent person. Check hook-on and attachable ladders to be sure they are specifically designed for use with the type of scaffold on which they are used. b.8 feet Employees doing overhand bricklaying from a supported scaffold must be protected by a guardrail or personal fall arrest system on all sides except the side where the work is being done. Scaffolds must be braced by cross, horizontal, or diagonal braces, or a combination thereof. a that apply to the following statement and then click DONE. The spaces between platforms cannot exceed one inch. c.13, 15 Utilizing the appropriate fall protection equipment / systems at heights above 10. b.One continuous mudsill under both legs 5. Final inspection of the scaffold prior to initial occupation for use. a.One mudsill per leg c.Select an anchor point for Personal Fall Arrest Systems (PFAS). When employees are plastering and lathing 18 inches or less from the front edge. Two feet What should you do before dismantling a scaffold? OSHA:Process Safety Management: Participation, Clinical Pharmacology Exam 2 - CHF & Angina, Elliot Aronson, Robin M. Akert, Timothy D. Wilson, Unternehemensfinanzierung in der EU und in de. A mobile ladder stand may also have handrails and is designed for use by one employee at a time. being laid. Check that direct access to or from another surface is permitted only when the scaffold is not more than 14 inches horizontally and not more than 24 inches vertically from the other surface. Scaffolding must not be placed on unstable objects, such as bricks or blocks. a.5 2. b.1 inch (1) A type of supported scaffold set on wheels or casters (2) A simple device consisting of a platform resting on brackets attached to a ladder (3) A uniquely designed scaffold consisting of a platform supported by moveable brackets on vertical poles (1)Mobile Scaffold (2) Ladder Scaffold (3) Pump Jack Scaffold TypeofAdvertisementProductAdvertisedTargetMarketProductInformationFeaturedTelevisionBlackberryStudents-backtoschoolBlackberryPearl;$20discount;pinkorsilver;usetogete-mail,surftheWeb,andgetdirections\begin{array}{llll}
Irving Mall Shooting 2022,
Articles A